Infrastructure Built for AI

330 MW of power-ready capacity with Tier 4+ redundancy, developer-funded infrastructure, and proven technology from industry leaders.

Power path

How the campus is powered

  1. IID grid4 connections2x 230kV S-Line, 2x 92kV R-Line
  2. On-site substation330 MW16 acres, developer-funded
  3. Tesla Megapack storage862 MWh220 Megapack 2XL, millisecond response
  4. AI data center950,000 sq ftTier 4+, 800 Gbps fiber
  • Emergency generators330 MW132 Caterpillar G3520, natural gas, emergency use only
  • Cooling water100% reclaimed~0.75 MGD, zero drinking water

330 MW on 16 acres

330 MW Substation

The on-site 330 MW substation spans 16 acres and connects directly to the Imperial Irrigation District grid via four independent connections—two to the 230kV S-Line and two to the 92kV R-Line.

Under IID Regulation 21, the developer funds 100% of infrastructure costs. This includes the $80 million substation, all grid interconnection work, and ongoing maintenance. No cost to local ratepayers.

SpecificationDetail
Capacity330 MW
Land Area16 Acres
Investment$80 Million (developer-funded)
Grid Connections4 (2x 230kV S-Line, 2x 92kV R-Line)
Regulatory FrameworkIID Regulation 21

862 MWh Tesla Megapack

862 MWh Tesla Megapack System

The Battery Energy Storage System (BESS) provides immediate backup power within milliseconds for critical loads. The system features 220 Tesla Megapack 2XL units across 164,500 square feet.

The BESS will not export electricity to the grid. Its use is solely for the Data Center, providing immediate support for short-term power disruptions and helping maintain continuous operations.

SpecificationDetail
Total Capacity862 MWh
Technology220 Tesla Megapack 2XL
Footprint164,500 sq ft
Response TimeMilliseconds
Grid ExportNone—solely for data center use

330 MW emergency backup

330 MW Emergency Generators

For extended outages beyond battery capacity, 132 Caterpillar G3520 natural gas generators provide 330 MW of backup power. The generators are housed in a dedicated 182,500 sq ft building.

Key Features

  • EPA Certified (SCPXB97.6CUL-003) meeting federal emission standards
  • Supplied by Quinn Power Systems, Los Angeles
  • Direct connection to SoCalGas high-pressure pipeline on Aten Road
  • No on-site fuel storage required
  • Emergency use only—will not connect to or export to grid
SpecificationDetail
Total Capacity330 MW
Equipment132 Caterpillar G3520
Building Size182,500 sq ft
Fuel SourceNatural Gas (SoCalGas pipeline)
EPA CertificationSCPXB97.6CUL-003
Grid ExportNone—emergency backup only

950,000 square feet

950,000 Square Feet of AI Infrastructure

The main data center building is purpose-built for artificial intelligence and machine learning operations. The single-story, 35-foot height design optimizes for cooling efficiency and operational flexibility.

SpecificationDetail
Size950,000 sq ft
Height35 feet (single story)
Primary UseAI and machine learning training
Tier RatingTier 4+
Connectivity800 Gbps fiber optic

100% reclaimed water

Zero Drinking Water

The facility operates on 100% reclaimed wastewater through a dedicated off-site pipeline connection. Zero Colorado River water. Zero impact on agricultural or residential water rights.

The project enables reclamation of 4 million gallons per day (MGD) while consuming only 0.75 MGD - creating a surplus of recycled water for the community.

Reclamation enabled4.0 MGD
Data center consumption~0.75 MGD
Community surplus3.25 MGD
SpecificationDetail
Water Source100% Reclaimed Wastewater
Consumption~0.75 MGD
Reclamation Enabled4.0 MGD
Community Surplus3.25 MGD
On-Site Storage2 x 500,000 gallon tanks
TreatmentOn-site water treatment skid

Campus Overview

Campus Overview

Aerial rendering of the Imperial Valley Data Center campus
950,000 sq ft data center182,500 sq ft generator building164,500 sq ft battery storage16-acre substation6-acre retention basin

The Imperial Valley Data Center campus spans multiple purpose-built facilities designed for maximum efficiency and reliability. The main data center building encompasses 950,000 square feet, supported by a 182,500 square foot emergency generator building and 164,500 square feet of battery storage. The on-site substation covers 16 acres, with an additional 6-acre retention basin for stormwater management and dual 500,000-gallon water storage tanks. The entire campus is secured by 8-foot concrete perimeter walls and 25-foot landscape buffer strips featuring drought-tolerant native plants. Dark sky-compliant lighting preserves the desert night sky, while 24/7 security operations ensure continuous protection of the facility.

Map of the proposed data center location and its neighbors
Project location map

Contact for Technical Inquiries

Studies, specifications and site documents are on the Studies page.

Contact us View studies